The founder team was officially established. Relying on more than 20 years of profound accumulation in the field of building industrialization, the GLR™ system (the predecessor of the G-Lite™ system) was established, establishing the multi-functional integration of "structural load bearing, thermal insulation, fire prevention and sound insulation". The technical direction lays a solid theoretical foundation for subsequent product development.
The R & D team focused on the composite technology of modified polystyrene particulate lightweight aggregate concrete and cold-formed thin-walled high-strength light steel, successfully overcome core technical problems such as lightweight and high-strength, Class A fire prevention and efficient insulation, completed laboratory verification and material formula optimization, and achieved product performance. Milestone breakthrough.
The intelligent manufacturing factory in Jiangmen, Guangdong Province was officially put into trial operation, and the first batch of G-Lite™ prefabricated wallboard products were successfully rolled off the production line, marking that the company has moved from technical research and development to large-scale production, has stable delivery capabilities, and has obtained product quality by the first batch of customers. recognition.
The first set of G-Lite™ system model houses was completed, which verified the significant advantages of "50% increase in speed and 30% overall cost savings" through actual projects, and was widely recognized by the industry. In the same year, the product was promoted on a large scale in the China market, covering multiple application scenarios such as rural revitalization and urban renewal.
The first overseas project was successfully implemented in Sydney, Australia. The products passed the Australian Intertek AS1530.4 fire resistance test, AS/NZS 1170.2 physical property test and AS5370 asbestos-free test, and fully complied with the NCC2025 national building code. The project was quickly delivered and the occupancy permit was successfully obtained, winning high praise from local developers.
Build joint laboratories with top universities such as the Hong Kong Polytechnic University and the University of Melbourne to deepen research on BIM digital design and intelligent construction technology. In the same year, the company established its global headquarters in Zhuhai, with the Guangdong-Hong Kong-Macao Greater Bay Area as its global headquarters, providing efficient and sustainable prefabricated building solutions to the global market, opening a new chapter in global development.
Integrate the world's top resources to promote the green and digital revolution in the construction industry
Become a trustworthy core partner in the global green building ecosystem